To provide a link between the platforms at Gisors station and the town centre, and to ensure accessibility for people with reduced mobility, a footbridge and access via stairs and lifts have been constructed.
The footbridge consists of a single main span with a railway impact-resistant pier, which will also serve as a support for a future additional crossing structure.
Foundations on a massed base and a lightweight semi-Vierendeel steel structure with wooden decking (Accoya type) and handrails incorporating protection for the overhead catenary system.
Supported on architectural concrete piers via pot bearings
Client: SNCF Réseau
Project management: MaP3 passerelle and AREP architects
Contractor: Eiffage civil engineering, ACCMA steel structure
Span: 25 m, width 3 m
Area: 270 m² including staircases
Steel weight: 26 tonnes and 16 tonnes for staircases
Completion: 2020
Localisation et Année de livraison :
France
- Gisors
- 2020
Les maitres d’oeuvres :
AREP (Architect) - MaP3 (Structural Engineer)