A new station for the Greater Paris rail network, serving lines 15 and 16, and the RER A.
The roof design was developed in collaboration with Agence Duthilleul and AREP, on behalf of Systra, the main contractor.
The roof consists of two intertwined spirals that meet at the top. The spirals are a mixed timber/steel structure and are supported by 12 tree-like columns. Water is drained at the base of the spirals via two waterfalls.
Client: Société du Grand Paris
Project Manager: Systra (main contractor) – Agence Duthilleul and AREP (Architects) – MaP3 (Structural Engineering)
Phase: PRO
Technical data: Roof area: 5,000 m²
Localisation et Année de livraison :
France
- Noisy-Champs
- 2016
Les maitres d’oeuvres :
Agence Duthilleul (Architects) – AREP – Systra (Infrastructure Engineering) – MaP3 (Structural and Façade Engineering)