Saint Nicolas Footbridges
Client: City of Montargis
Contractor: ETS VAILLANT steel structure
Detailed design office: MaP3
Span: 34m
Scope: Detailed structural calculations for the contractor. Structural and dynamic analysis of the deck of the two pedestrian footbridges over the Briare Canal.
Localisation and Delivery Year :
France
- Montargis
- 2010
Designers :
P. CARUDEL CEU (Architect) - MaP3 (Structural Engineer)